Featured Projects

180-acre Evaporation Pond and Leak Detection System

Excavate 5,500,000 cy, place in embankments, and installation of complex leak detection system in bottom of 180 acre pond

Home Development Groundwork and Utility Systems

Park Place New Development, turn-key operation from clearing to paving drill & shoot basements, storm drain, sewer, water, electrical, curb & gutter

Las Palomas Golf Course

Built new golf course and four new SS-13 lined lakes for Mexico resort

read more »

We would like to express our appreciation for the cooperation and professional effort of Tiffany Construction

Volvo Proving Grounds

Paul S. Hosmann, Project Manager

Projects

Owner/Contractor Work Description Amount Date Completed
APS Palo Verde – Rip Rap / Rock Mulch
For APS PVNGS
Shabbir Pittalwala
623-393-5405
Evaporation Pond #2 at Palo Verde Nuclear Generating Station:
Place 20,300 SF 10″” Riprap, Place 138,500 SF 6″” Riprap, Excavate & Backfill Scour Trench, Place 75,600 SY 3″” Rock Mulch, Remove existing Earth Ramps.
$651,500 2011
APS Four Corners Power Plant
For APS 4 Corners Power Plant
Byron Conrad
602-250-5455
Clay Fill (Lower & Upper Lifts) to raise Dam, Cut-Off Clay Cap, Slurry Wall $884,716 2011
APS EP-2B AEGL Trench, Pipe, Finishing
For APS PVNGS
AEGL / Gerald Hersch
713-858-3568
Hand Finishing and Preparatory work ahead of HDPE Liner for PVNGS. $855,572 2011
APS Palo Verde CW1200 Unit 2
For APS PVNGS
Roger Fongemie
602-319-3568
Replace a section of 96″ pipe during the Outage for Unit 2, Tower #1. Work included support services, Excavation, Backfill, & Shoring. $490,000 2011
Evap Pond 2 Salt/Liner Removal
For APS PVNGS
Shabbir Pittalwala
623-393-5405
Remove existing Salts and liner for new pond construction. $2,994,800 2011
APS Unit 3 Cooling Tower Support
For APS PVNGS
Shabbir Pittalwala
623-393-5405
Replace a section of 96″ pipe during the Outage for Unit 3, Tower #1. Work included support services, Excavation, Backfill, & Shoring. $1,045,290 2010
Northview Lift Station
City of Sedona
David Mann
928-204-7809
Construction of new lift station including gravity and forcemains. $469,105 2010
Forest Highlands Effluent Pond
For Forest Highlands Public Works
Director of Public Works Bill Strauss
928-525-5264
Construction of New Effluent Pond and piping $914,610 2010
Camp Soaring Eagle
Morris Company
Bob Stimson
928-282-5513
Complete infrastructure for new camp for terminally ill children. $4,106,412 2010
APS Saguaro Lined Pond
For APS
Byron Conrad
602-250-5455
Excavate Pond for Installation of Liner $440,000 2010
Cottonwood JOC Work
For City of Cottonwood
Roger Biggs 928-301-8893
Dan Leuder 928-634-0186
On-going Public Works Projects. Contract is service and main line repairs grading, paving, storm drain, wet utilities and piping for arsenic treatment plants and for emergency work. Currently 12 separate contracts have been issued under this JOC. $701,870 2010
Soil Cement-APS
For APS PVNGS
Shabbir Pittalwala
623-393-5405
Apply Soil Cement for Cooling Ponds $1,493,100 2010
L’Auberge Renovation
Al Spector
602-819-8809
Facilitated addition of 32 cottages and New Arrivals building. All sitework and installaion of new utilities within the luxury resort. Also added a two-story concrete parking garage, while resort was operational $9,132,717 2010
Clarkdale Emergency Repairs
For Town of Clarkdale
Clarkedale Utilities Director – Wayne Debrosky
928-639-2525
Contract for Emergency Service Repairs of water and sewer piping with a two hour response time. Also scheduled repairs and mainline extensions $300,000 2010 – Ongoing
Harmony Windsong Construction
For City of Sedona
Asst. City Engineer – Andy Dickey
928-203-5039
Construct Large Diameter Drainage System & Structures; Asphalt Paving and Landscaping $1,704,583 2010
Chapel Sewer
For City of Sedona
Chief Public Works Inspector – Sal Valenzuela
928-203-5030
Piping and repaving of all roadways in subdivision Installation of sewer mainline, sewer laterals, manholes and stormdrains and structures. $10,082,948 2010
Coconino County JOC Work
For Coconino County
Jon Ebers
County-Wide Roadway & Drainage Maintenance and Improvements Job Order Contracting (JOC); up to $1MM per contract. Currently 10 separate PO’s have been issued under this JOC, the largest being $764,190. $1,493,100 2008 – Ongoing
3rd Nine
For Cottonwood Properties
Ed Francese
520-572-1289
Jack Nicklaus designed Golf Course 9 Holes $1,885,744 2008
180 Acre Evaporation Pond
For APS PVNGS
Shabbir Pittalwala
623-393-5405
Excavate 5,500,000 cy and place in embankments $10,600,000 2008
Leak Detection System
Pond 3 APS/PVNGS
Shabbir Pittalwala
623-393-5405
Install complex leak detection system in bottom of 180 acre pond $1,600,000 2008
Asphalt Paving
APS/PVNGS
Shabbir Pittalwala
623-393-5405
Paving of existing roadways throughout the nuclear plant $3,500,000 2008
80 Acre Lake for APS
PVNGS
Roger Fongemie
623-393-0725
Remove and replace liner system, add new underdrain, regrade slopes $1,500,000 2007
Bechtel Haul Route for APS
810 Ton Steam Generators
APS/Bechtel
Ralph Medley, Civil Engineer
623-393-7691
Building new roads inside the Palo Verde Nuclear Generating Station for the replacement of the 810 Ton steam generators $1,500,000 2007
Aeries Development
Community Southwest
Bob Olive, Project Manager
602-570-3956
Complete infrastructure including Water Production Facilities $6,000,000 2007
Timber Trails Apartments
Gold Creek Developers
John Addison, Project Manager
480-368-1500
Grading and paving, sewer, water, storm drains and dry utilities $700,000 2007
Park Place
Schaller
Gary Kincaid, Project Manager
928-202-2327
New Development, turn-key operation from clearing to paving drill & shoot basements, storm drain, sewer, water, electrical, curb & gutter $5,616,642 2007
Vistancia Development
Cachet Homes
Mike Corkle, Project Manager
480-556-7030
Install underground sewer, water, storm drain and dry utilities for new housing development $1,398,138 2007
Uptown Enhancement
City of Sedona
Charles Mosley, City Engineer
928-204-7132
CMAR Project to improve Uptown Shopping District with drainage improvements, catch basins, specialty sidewalks to meet ADA requirements, landscape, light poles $3,300,000 2006
Kachina & Yavapino CMAR
City of Sedona
Charles Mosley, City Engineer
928-204-7132
Sewer line and realignment project for the City of Sedona, Rock Excavation $1,150,000 2007
Bella Terra Development
BySynergy
Mike Zito, Owner
928-231-0223
New Development, infrastructure from grading to paving, new roads, utilities, sewer and water treatment plants $3,637,369 2007
Phelps Dodge Cutter Aviation
Mike Cook, Project Manager
602-403-4461
Airplane Hangers, underground sewer & water utilities, concrete and asphalt paving for new parking areas and taxiway $4,064,559 2006/2007
Pardee Homes Quintana Lakes
Thermal, California
Robert Skands, P.E.
Senior Land Development Manager
951-817-3405
Lake Lining for high water table lake construction using Geogrid, filter fabric & soil cement, SS-13 $1,393,000 2006
NAU North Campus Utilities
Northern Arizona University
John Summa, Project Manager
602-254-2165
CMAR Project, included excavation and backfill for new utilities on campus $479,822 2006
McGuireville Rest Area
Arizona Department of Transportation
Andy Roth, Project Manager
928-759-2426 ext 3624
Construct evaporative, septic beds and piping for public rest stop area $1,354,000 2006
Chateau on Central
Gold Creek Developers
John Addison, Project Manager
480-368-1500
Infrastructure including basement excavation, backfilling of building walls, dry utilities, sidewalks, curb & gutter, paving $700,000 2006
ASU McAllister Village
Southloop Corridor Utilities
Arizona State University
Dick Herzog, Inspector
602-818-3324
CMAR Project, Welded, Pre-insulated, Steam and Condensate lines for new Central Plant. Poured-in-place manholes and electrical vaults, electrical lines, landscaping and paving $5,299,977 2005
Las Palomas Golf Course
Puerto Peñasco, Mexico
Forest Richardson, Golf Course
Architect, 602-906-1811
Built new golf course and four new SS-13 lined lakes for Mexico resort $1,894,520 2004