| Owner/Contractor | Work Description | Amount | Date Completed |
|---|---|---|---|
| APS Palo Verde – Rip Rap / Rock Mulch For APS PVNGS Shabbir Pittalwala 623-393-5405 |
Evaporation Pond #2 at Palo Verde Nuclear Generating Station: Place 20,300 SF 10″” Riprap, Place 138,500 SF 6″” Riprap, Excavate & Backfill Scour Trench, Place 75,600 SY 3″” Rock Mulch, Remove existing Earth Ramps. |
$651,500 | 2011 |
| APS Four Corners Power Plant For APS 4 Corners Power Plant Byron Conrad 602-250-5455 |
Clay Fill (Lower & Upper Lifts) to raise Dam, Cut-Off Clay Cap, Slurry Wall | $884,716 | 2011 |
| APS EP-2B AEGL Trench, Pipe, Finishing For APS PVNGS AEGL / Gerald Hersch 713-858-3568 |
Hand Finishing and Preparatory work ahead of HDPE Liner for PVNGS. | $855,572 | 2011 |
| APS Palo Verde CW1200 Unit 2 For APS PVNGS Roger Fongemie 602-319-3568 |
Replace a section of 96″ pipe during the Outage for Unit 2, Tower #1. Work included support services, Excavation, Backfill, & Shoring. | $490,000 | 2011 |
| Evap Pond 2 Salt/Liner Removal For APS PVNGS Shabbir Pittalwala 623-393-5405 |
Remove existing Salts and liner for new pond construction. | $2,994,800 | 2011 |
| APS Unit 3 Cooling Tower Support For APS PVNGS Shabbir Pittalwala 623-393-5405 |
Replace a section of 96″ pipe during the Outage for Unit 3, Tower #1. Work included support services, Excavation, Backfill, & Shoring. | $1,045,290 | 2010 |
| Northview Lift Station City of Sedona David Mann 928-204-7809 |
Construction of new lift station including gravity and forcemains. | $469,105 | 2010 |
| Forest Highlands Effluent Pond For Forest Highlands Public Works Director of Public Works Bill Strauss 928-525-5264 |
Construction of New Effluent Pond and piping | $914,610 | 2010 |
| Camp Soaring Eagle Morris Company Bob Stimson 928-282-5513 |
Complete infrastructure for new camp for terminally ill children. | $4,106,412 | 2010 |
| APS Saguaro Lined Pond For APS Byron Conrad 602-250-5455 |
Excavate Pond for Installation of Liner | $440,000 | 2010 |
| Cottonwood JOC Work For City of Cottonwood Roger Biggs 928-301-8893 Dan Leuder 928-634-0186 |
On-going Public Works Projects. Contract is service and main line repairs grading, paving, storm drain, wet utilities and piping for arsenic treatment plants and for emergency work. Currently 12 separate contracts have been issued under this JOC. | $701,870 | 2010 |
| Soil Cement-APS For APS PVNGS Shabbir Pittalwala 623-393-5405 |
Apply Soil Cement for Cooling Ponds | $1,493,100 | 2010 |
| L’Auberge Renovation Al Spector 602-819-8809 |
Facilitated addition of 32 cottages and New Arrivals building. All sitework and installaion of new utilities within the luxury resort. Also added a two-story concrete parking garage, while resort was operational | $9,132,717 | 2010 |
| Clarkdale Emergency Repairs For Town of Clarkdale Clarkedale Utilities Director – Wayne Debrosky 928-639-2525 |
Contract for Emergency Service Repairs of water and sewer piping with a two hour response time. Also scheduled repairs and mainline extensions | $300,000 | 2010 – Ongoing |
| Harmony Windsong Construction For City of Sedona Asst. City Engineer – Andy Dickey 928-203-5039 |
Construct Large Diameter Drainage System & Structures; Asphalt Paving and Landscaping | $1,704,583 | 2010 |
| Chapel Sewer For City of Sedona Chief Public Works Inspector – Sal Valenzuela 928-203-5030 |
Piping and repaving of all roadways in subdivision Installation of sewer mainline, sewer laterals, manholes and stormdrains and structures. | $10,082,948 | 2010 |
| Coconino County JOC Work For Coconino County Jon Ebers |
County-Wide Roadway & Drainage Maintenance and Improvements Job Order Contracting (JOC); up to $1MM per contract. Currently 10 separate PO’s have been issued under this JOC, the largest being $764,190. | $1,493,100 | 2008 – Ongoing |
| 3rd Nine For Cottonwood Properties Ed Francese 520-572-1289 |
Jack Nicklaus designed Golf Course 9 Holes | $1,885,744 | 2008 | 180 Acre Evaporation Pond For APS PVNGS Shabbir Pittalwala 623-393-5405 |
Excavate 5,500,000 cy and place in embankments | $10,600,000 | 2008 |
| Leak Detection System Pond 3 APS/PVNGS Shabbir Pittalwala 623-393-5405 |
Install complex leak detection system in bottom of 180 acre pond | $1,600,000 | 2008 |
| Asphalt Paving APS/PVNGS Shabbir Pittalwala 623-393-5405 |
Paving of existing roadways throughout the nuclear plant | $3,500,000 | 2008 |
| 80 Acre Lake for APS PVNGS Roger Fongemie 623-393-0725 |
Remove and replace liner system, add new underdrain, regrade slopes | $1,500,000 | 2007 |
| Bechtel Haul Route for APS 810 Ton Steam Generators APS/Bechtel Ralph Medley, Civil Engineer 623-393-7691 |
Building new roads inside the Palo Verde Nuclear Generating Station for the replacement of the 810 Ton steam generators | $1,500,000 | 2007 |
| Aeries Development Community Southwest Bob Olive, Project Manager 602-570-3956 |
Complete infrastructure including Water Production Facilities | $6,000,000 | 2007 |
| Timber Trails Apartments Gold Creek Developers John Addison, Project Manager 480-368-1500 |
Grading and paving, sewer, water, storm drains and dry utilities | $700,000 | 2007 |
| Park Place Schaller Gary Kincaid, Project Manager 928-202-2327 |
New Development, turn-key operation from clearing to paving drill & shoot basements, storm drain, sewer, water, electrical, curb & gutter | $5,616,642 | 2007 |
| Vistancia Development Cachet Homes Mike Corkle, Project Manager 480-556-7030 |
Install underground sewer, water, storm drain and dry utilities for new housing development | $1,398,138 | 2007 |
| Uptown Enhancement City of Sedona Charles Mosley, City Engineer 928-204-7132 |
CMAR Project to improve Uptown Shopping District with drainage improvements, catch basins, specialty sidewalks to meet ADA requirements, landscape, light poles | $3,300,000 | 2006 |
| Kachina & Yavapino CMAR City of Sedona Charles Mosley, City Engineer 928-204-7132 |
Sewer line and realignment project for the City of Sedona, Rock Excavation | $1,150,000 | 2007 |
| Bella Terra Development BySynergy Mike Zito, Owner 928-231-0223 |
New Development, infrastructure from grading to paving, new roads, utilities, sewer and water treatment plants | $3,637,369 | 2007 |
| Phelps Dodge Cutter Aviation Mike Cook, Project Manager 602-403-4461 |
Airplane Hangers, underground sewer & water utilities, concrete and asphalt paving for new parking areas and taxiway | $4,064,559 | 2006/2007 |
| Pardee Homes Quintana Lakes Thermal, California Robert Skands, P.E. Senior Land Development Manager 951-817-3405 |
Lake Lining for high water table lake construction using Geogrid, filter fabric & soil cement, SS-13 | $1,393,000 | 2006 |
| NAU North Campus Utilities Northern Arizona University John Summa, Project Manager 602-254-2165 |
CMAR Project, included excavation and backfill for new utilities on campus | $479,822 | 2006 |
| McGuireville Rest Area Arizona Department of Transportation Andy Roth, Project Manager 928-759-2426 ext 3624 |
Construct evaporative, septic beds and piping for public rest stop area | $1,354,000 | 2006 |
| Chateau on Central Gold Creek Developers John Addison, Project Manager 480-368-1500 |
Infrastructure including basement excavation, backfilling of building walls, dry utilities, sidewalks, curb & gutter, paving | $700,000 | 2006 |
| ASU McAllister Village Southloop Corridor Utilities Arizona State University Dick Herzog, Inspector 602-818-3324 |
CMAR Project, Welded, Pre-insulated, Steam and Condensate lines for new Central Plant. Poured-in-place manholes and electrical vaults, electrical lines, landscaping and paving | $5,299,977 | 2005 |
| Las Palomas Golf Course Puerto Peñasco, Mexico Forest Richardson, Golf Course Architect, 602-906-1811 |
Built new golf course and four new SS-13 lined lakes for Mexico resort | $1,894,520 | 2004 |